Industry
Waste incineration plant, UK.
Challenge:
The waste incineration plant is situated close to the
oldest marine base in Europe.
The client requested a quotation for the application
of a specialist coating system to protect the internals
of venting de-slagger pipework at the Energy from
Waste plant. The plant burns municipal solid waste
and industrial and commercial waste, producing IBA
(Incinerator Bottom Ash) as a waste product.
The Solution:
The quotation included the abrasive blasting and
coating application on the inlet and outlet section of
the highlighted pipe sections onsite. All
non-highlighted pipework was disassembled,
removed and transported to Corroserve’s workshop,
in Leeds, where the blasting and coating work was
completed.
Scaffolding was provided for the remaining pipework,
to provide access into the pieces and to ensure the pipes
were sufficiently supported. This allowed personnel
and equipment to enter the pipe, and carry out the
blasting and coating works.
Products Used:
Corroglass 600 series.